Maintenance Services. Relocations and Transfers

We offer periodic inspections, maintenance, repairs, and overhauls of our clients' production equipment.

Our specialty is maintenance services for machines and equipment used in the processing of elastomers and plastics, including:

  • Injection molding machines
  • Extrusion lines
  • Hydraulic presses
  • Cutting and punching devices
  • Others

We have experience in maintenance services for installations used in the preparation of rubber mixtures, consisting of:

  • Raw material conveying systems
  • Mixers
  • Roll mills/mixers
  • Coolers

We carry out work comprehensively or as support for the client's maintenance team.

We also provide a comprehensive service for maintenance inspections of lifting devices, along with resource management for the following equipment:

  • Manual and mechanical hoists
  • Cranes
  • Jib cranes
  • Aerial work platforms
  • Electric freight and passenger elevators
  • Others

We conduct proper classification, determine inspection intervals, and carry out inspections and repairs. We confirm the completion of work with entries in maintenance logs.

We provide specialized services in the disassembly, relocation, and installation of machines and equipment.

 

We carry out projects in a comprehensive manner, ensuring that the entire process proceeds as quickly as possible. We understand that relocation processes must be smooth and safe, without negatively impacting our clients' ongoing operations.

We have an experienced and qualified team equipped with the necessary tools to handle even the most challenging and complex operations. These objectives are achieved by employing best practice-based procedures during the planning, execution, and final acceptance phases, particularly through:

  • Managing the work with a dedicated Project Manager
  • Preparing and providing the client with detailed information on the implementation method and risk assessment
  • Agreeing on the schedule and reporting methods for progress
  • Organizing and coordinating individual tasks
  • Maintaining close cooperation with transport companies
  • Ongoing safety monitoring

Executing all agreed procedures for final acceptance with the client and presenting the relevant reports.

Implementations

 Since 2016, we have successfully completed dozens of projects with varying scopes of work in several locations across Europe.

 

Examples of our realisations

2023

Job name Operation range Performing date Customer
Unloading of the rolling mill Unloading, in-house transport, and installation according to a location plan, making the utility connection 2023 WPS Sp. z o.o.
Foundation and installation of the milling machine with feeder and crane Unloading, in-house transport and installation according to a location plan, installation of the electrical and compressed air system 2023 WPS Sp. z o.o.
Installation of the measuring machine Assembly and installation of the compressed air system 2023 WPS Sp. z o.o.
Lifting the lighting structure in H4 hall Modification of the existing installation 2023 Sanok Rubber Company
Implementation of 13 individual projects regarding different machines and equipment Disassembly, in-house transport, and installation according to a location plan 2023 Sanok Rubber Company

2022

Job name Operation range Performing date Customer
Relocation of two HAAS CNC milling machines Disassembly, in-house transport, and installation according to a location plan 2022 ADR Polska Sp. z o.o.
Loading of the Buzuluk rolling mill Loading onto a vehicle 2022 GUMEX Producent Części Motoryzacyjnych
Relocation and foundation of the LWB4500 machine Disassembly, in-house transport, and installation according to a location plan 2022 SumiRiko Poland Sp. z o. o.
Making the utility connection to the LWB 6300 injection moulding machine Connection of water, compressed air and extraction ventilation systems 2022 SumiRiko Poland Sp. z o. o.
Machine relocation Disassembly, in-house transport, and installation according to a location plan 2022 WPS Sp. z o.o.
Extension of the compressed air system Modification of the compressed air system 2022 WPS Sp. z o.o.
Assembly of Rubicon extrusion line Positioning and alignment of the line components  2022 Sanok Rubber Company
Implementation of 15 individual projects regarding different machines and equipment Disassembly, in-house transport, and installation according to a location plan 2022 Sanok Rubber Company

2021

Job name Operation range Performing date Customer
Relocation of two HASS ST35 CNC lathes Disassembly, in-house transport, and installation according to a location plan 2021 ADR Polska Sp. z o.o.
Hoist relocation Disassembly, in-house transport, and installation according to a location plan 2021 ADR Polska Sp. z o.o.
Disassembly and loading of the Maplan GSP 630 machine Disassembly, in-house transport, loading and securing during transport 2021 Fibrax Sanok Sp. z o.o.
Unloading and foundation of the ENGEL injection moulding machine Unloading, in-house transport, and installation according to a location plan 2021 Fibrax Sanok Sp. z o.o.
Installation of a cooling system for four ENGEL injection moulding machines Disassembly of the outdated and installing a new cooling system 2021 Fibrax Sanok Sp. z o.o.
Unloading and relocation of a HAAS CNC milling machine Unloading, in-house transport, and installation according to a location plan 2021 MDM PROJECT Sp. z o.o.
Installation of a new rubber mixer Disassembly of the components of the outdated mixer, unloading and assembling the new mixer according to a location plan, installation of the hydraulic system, assembling the components of the new mixer 2021 Sanok Rubber Company
Implementation of 14 individual projects regarding different machines and equipment Disassembly, in-house transport, and installation according to a location plan 2021 Sanok Rubber Company

2020

Job name Operation range Performing date Customer
Transfer of the injection presses to a new production hall Disconnection of the machine, securing and internal transport, setting and assembly according to the location plan 2020 Sanok Rubber Company
Transfer of the production areas to a new hall - stations for cutting and punching rubber profiles, lamination stations, manual varnishing station Disconnection from the media, securing and internal transport, setting and assembly according to the location plan 2020 Sanok Rubber Company
Relocation and setting of CNC lathes (8 pcs.) Disconnection of the machine, securing and internal transport, setting and assembly according to the location plan 2020 ADR Polska 
Unloading and assembly of the elastomer extrusion line Unloading, securing and internal transport, setting and assembly according to the location plan 2020 Sanok Rubber Company
Transfer of two plastic extrusion lines  Disassembly of the line, internal transport and assembly according to the location plan 2020 Sanok Rubber Company
Relocation of 4 STI machines Disconnection from the utilities, transport inside the hall, assembly according to the location plan, supply and connection of utilities 2020 SumiRiko Poland Sp. z o.o.
Media supply to 4 LWB injection moulding machines in a new location Supply of electric cables, cooling water, compressed air. Removal of unnecessary installations 2020 SumiRiko Poland Sp. z o.o.
Installation of two six-axis robot stations with media and peripherals connection Unloading, internal transport, assembly according to the location plan and documentation 2020 SumiRiko Poland Sp. z o.o.
Visual renewal of the production line Disassembly of used elements, regeneration, repair, assembly, replacement of heat shields with new ones, painting 2020 SumiRiko Poland Sp. z o.o.
Assembly of a platform for the production line operators Transport, unloading, internal transport, assembly according to the location plan and documentation 2020 SumiRiko Poland Sp. z o.o.

2019

Job name Operation range

Performing

date

Customer
Relocation of 4 LWB injection molding machines Machines disasembly, internal transport and reassembly according to foundation plan 2019 SumiRiko Poland
Unloading and installing CNC lathe Unloading, internal transport and reassembly according to foundation plan 2019 DRUMMONDS Sp. z o.o.
Unloading and installing ENGEL injection molding machine Unloading, internal transport and reassembly according to foundation plan 2019 Fibrax Sanok Sp. z o.o. 
Machines unloading Machines unloading and preparing for internal transport 2019 Pass Polska Sp. z o.o.
Implementation of 12 separate projects for various machines and devices Unloading, internal transport and reassembly according to foundation plan 2019 SANOK RC

2018

-
Job name Operation range

Performing

date

Customer
Unloading and installing 2 machining devices Unloading, internal transport and reassembly according to foundation plan 2018 DRUMMONDS Sp. z o.o.
Replacement of rubber compounds production line elements

Disassembly of worn line elements (mixer, cooler, rolling mill, etc.), new equipment unloading, internal transport and reassembly according to foundation plan

2018 SANOK RC
Implementation of 16 separate projects for various machines and devices Unloading, internal transport and reassembly according to foundation plan 2018 SANOK RC


 

2017

Job name Operation range

Performing date

Customer

Relocation of cutting body seals device from Germany to Poland

Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan 2017 DRAFTEX AUTOMOTIVE GMBH
Implementation of 12 separate projects for various machines and devices Unloading, internal transport and reassembly according to foundation plan 2017 SANOK RC
Unloading and installing 2 DESMA 560 injection molding machines Unloading, internal transport and reassembly according to foundation plan 2017 Fibrax Sanok Sp. z o.o. 
Relocation of 2 vulcanization presses from England to Poland Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan 2017 BWI UK LTD

2016

Job name Operation range

Performing date

Customer
Relocation of elastomer injection molding machines to new production hall Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan 2016 Fibrax Sanok Sp. z o.o. 

Implementation of 8 separate projects for various machines and devices

Unloading, internal transport and reassembly according to foundation plan 2016 SANOK RC

Relocation of 5 vulcanization presses and Limberger paint shop from England to Poland

Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan 2016 BWI UK LTD

Get in touch with us