Maintenance Services. Relocations and Transfers
We offer periodic inspections, maintenance, repairs, and overhauls of our clients' production equipment.
Our specialty is maintenance services for machines and equipment used in the processing of elastomers and plastics, including:
- Injection molding machines
- Extrusion lines
- Hydraulic presses
- Cutting and punching devices
- Others
We have experience in maintenance services for installations used in the preparation of rubber mixtures, consisting of:
- Raw material conveying systems
- Mixers
- Roll mills/mixers
- Coolers
We carry out work comprehensively or as support for the client's maintenance team.
We also provide a comprehensive service for maintenance inspections of lifting devices, along with resource management for the following equipment:
- Manual and mechanical hoists
- Cranes
- Jib cranes
- Aerial work platforms
- Electric freight and passenger elevators
- Others
We conduct proper classification, determine inspection intervals, and carry out inspections and repairs. We confirm the completion of work with entries in maintenance logs.
We provide specialized services in the disassembly, relocation, and installation of machines and equipment.
We carry out projects in a comprehensive manner, ensuring that the entire process proceeds as quickly as possible. We understand that relocation processes must be smooth and safe, without negatively impacting our clients' ongoing operations.
We have an experienced and qualified team equipped with the necessary tools to handle even the most challenging and complex operations. These objectives are achieved by employing best practice-based procedures during the planning, execution, and final acceptance phases, particularly through:
- Managing the work with a dedicated Project Manager
- Preparing and providing the client with detailed information on the implementation method and risk assessment
- Agreeing on the schedule and reporting methods for progress
- Organizing and coordinating individual tasks
- Maintaining close cooperation with transport companies
- Ongoing safety monitoring
Executing all agreed procedures for final acceptance with the client and presenting the relevant reports.
Implementations
Since 2016, we have successfully completed dozens of projects with varying scopes of work in several locations across Europe.
Examples of our realisations
2023
Job name | Operation range | Performing date | Customer |
---|---|---|---|
Unloading of the rolling mill | Unloading, in-house transport, and installation according to a location plan, making the utility connection | 2023 | WPS Sp. z o.o. |
Foundation and installation of the milling machine with feeder and crane | Unloading, in-house transport and installation according to a location plan, installation of the electrical and compressed air system | 2023 | WPS Sp. z o.o. |
Installation of the measuring machine | Assembly and installation of the compressed air system | 2023 | WPS Sp. z o.o. |
Lifting the lighting structure in H4 hall | Modification of the existing installation | 2023 | Sanok Rubber Company |
Implementation of 13 individual projects regarding different machines and equipment | Disassembly, in-house transport, and installation according to a location plan | 2023 | Sanok Rubber Company |
2022
Job name | Operation range | Performing date | Customer |
---|---|---|---|
Relocation of two HAAS CNC milling machines | Disassembly, in-house transport, and installation according to a location plan | 2022 | ADR Polska Sp. z o.o. |
Loading of the Buzuluk rolling mill | Loading onto a vehicle | 2022 | GUMEX Producent Części Motoryzacyjnych |
Relocation and foundation of the LWB4500 machine | Disassembly, in-house transport, and installation according to a location plan | 2022 | SumiRiko Poland Sp. z o. o. |
Making the utility connection to the LWB 6300 injection moulding machine | Connection of water, compressed air and extraction ventilation systems | 2022 | SumiRiko Poland Sp. z o. o. |
Machine relocation | Disassembly, in-house transport, and installation according to a location plan | 2022 | WPS Sp. z o.o. |
Extension of the compressed air system | Modification of the compressed air system | 2022 | WPS Sp. z o.o. |
Assembly of Rubicon extrusion line | Positioning and alignment of the line components | 2022 | Sanok Rubber Company |
Implementation of 15 individual projects regarding different machines and equipment | Disassembly, in-house transport, and installation according to a location plan | 2022 | Sanok Rubber Company |
2021
Job name | Operation range | Performing date | Customer |
---|---|---|---|
Relocation of two HASS ST35 CNC lathes | Disassembly, in-house transport, and installation according to a location plan | 2021 | ADR Polska Sp. z o.o. |
Hoist relocation | Disassembly, in-house transport, and installation according to a location plan | 2021 | ADR Polska Sp. z o.o. |
Disassembly and loading of the Maplan GSP 630 machine | Disassembly, in-house transport, loading and securing during transport | 2021 | Fibrax Sanok Sp. z o.o. |
Unloading and foundation of the ENGEL injection moulding machine | Unloading, in-house transport, and installation according to a location plan | 2021 | Fibrax Sanok Sp. z o.o. |
Installation of a cooling system for four ENGEL injection moulding machines | Disassembly of the outdated and installing a new cooling system | 2021 | Fibrax Sanok Sp. z o.o. |
Unloading and relocation of a HAAS CNC milling machine | Unloading, in-house transport, and installation according to a location plan | 2021 | MDM PROJECT Sp. z o.o. |
Installation of a new rubber mixer | Disassembly of the components of the outdated mixer, unloading and assembling the new mixer according to a location plan, installation of the hydraulic system, assembling the components of the new mixer | 2021 | Sanok Rubber Company |
Implementation of 14 individual projects regarding different machines and equipment | Disassembly, in-house transport, and installation according to a location plan | 2021 | Sanok Rubber Company |
2020
Job name | Operation range | Performing date | Customer |
---|---|---|---|
Transfer of the injection presses to a new production hall | Disconnection of the machine, securing and internal transport, setting and assembly according to the location plan | 2020 | Sanok Rubber Company |
Transfer of the production areas to a new hall - stations for cutting and punching rubber profiles, lamination stations, manual varnishing station | Disconnection from the media, securing and internal transport, setting and assembly according to the location plan | 2020 | Sanok Rubber Company |
Relocation and setting of CNC lathes (8 pcs.) | Disconnection of the machine, securing and internal transport, setting and assembly according to the location plan | 2020 | ADR Polska |
Unloading and assembly of the elastomer extrusion line | Unloading, securing and internal transport, setting and assembly according to the location plan | 2020 | Sanok Rubber Company |
Transfer of two plastic extrusion lines | Disassembly of the line, internal transport and assembly according to the location plan | 2020 | Sanok Rubber Company |
Relocation of 4 STI machines | Disconnection from the utilities, transport inside the hall, assembly according to the location plan, supply and connection of utilities | 2020 | SumiRiko Poland Sp. z o.o. |
Media supply to 4 LWB injection moulding machines in a new location | Supply of electric cables, cooling water, compressed air. Removal of unnecessary installations | 2020 | SumiRiko Poland Sp. z o.o. |
Installation of two six-axis robot stations with media and peripherals connection | Unloading, internal transport, assembly according to the location plan and documentation | 2020 | SumiRiko Poland Sp. z o.o. |
Visual renewal of the production line | Disassembly of used elements, regeneration, repair, assembly, replacement of heat shields with new ones, painting | 2020 | SumiRiko Poland Sp. z o.o. |
Assembly of a platform for the production line operators | Transport, unloading, internal transport, assembly according to the location plan and documentation | 2020 | SumiRiko Poland Sp. z o.o. |
2019
Job name | Operation range |
Performing date |
Customer |
---|---|---|---|
Relocation of 4 LWB injection molding machines | Machines disasembly, internal transport and reassembly according to foundation plan | 2019 | SumiRiko Poland |
Unloading and installing CNC lathe | Unloading, internal transport and reassembly according to foundation plan | 2019 | DRUMMONDS Sp. z o.o. |
Unloading and installing ENGEL injection molding machine | Unloading, internal transport and reassembly according to foundation plan | 2019 | Fibrax Sanok Sp. z o.o. |
Machines unloading | Machines unloading and preparing for internal transport | 2019 | Pass Polska Sp. z o.o. |
Implementation of 12 separate projects for various machines and devices | Unloading, internal transport and reassembly according to foundation plan | 2019 | SANOK RC |
2018
Job name | Operation range |
Performing date |
Customer |
---|---|---|---|
Unloading and installing 2 machining devices | Unloading, internal transport and reassembly according to foundation plan | 2018 | DRUMMONDS Sp. z o.o. |
Replacement of rubber compounds production line elements |
Disassembly of worn line elements (mixer, cooler, rolling mill, etc.), new equipment unloading, internal transport and reassembly according to foundation plan |
2018 | SANOK RC |
Implementation of 16 separate projects for various machines and devices | Unloading, internal transport and reassembly according to foundation plan | 2018 | SANOK RC |
2017
Job name | Operation range |
Performing date |
Customer |
---|---|---|---|
Relocation of cutting body seals device from Germany to Poland |
Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan | 2017 | DRAFTEX AUTOMOTIVE GMBH |
Implementation of 12 separate projects for various machines and devices | Unloading, internal transport and reassembly according to foundation plan | 2017 | SANOK RC |
Unloading and installing 2 DESMA 560 injection molding machines | Unloading, internal transport and reassembly according to foundation plan | 2017 | Fibrax Sanok Sp. z o.o. |
Relocation of 2 vulcanization presses from England to Poland | Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan | 2017 | BWI UK LTD |
2016
Job name | Operation range |
Performing date |
Customer |
---|---|---|---|
Relocation of elastomer injection molding machines to new production hall | Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan | 2016 | Fibrax Sanok Sp. z o.o. |
Implementation of 8 separate projects for various machines and devices |
Unloading, internal transport and reassembly according to foundation plan | 2016 | SANOK RC |
Relocation of 5 vulcanization presses and Limberger paint shop from England to Poland |
Machines disassembly, securing for transportation and loading, shipment, unloading, reassembly according to foundation plan | 2016 | BWI UK LTD |